Lab: build an inventory policy sheet

Build the sheet yourself, formula by formula, for a passive infra item. A working simulated spreadsheet checks each step: EOQ, Z value, safety stock, reorder point and the total cost curve. Then test two service levels and decide which one the item deserves. Allow about 15 minutes.

1

Pick an item

Demand is for an imagined cluster of about 1,500 sites

Data card

2

Build the sheet

Type into the yellow-bordered cells. Formulas start with =
Policy sheet
fx

Your checklist

Name box: click a cell, then type a name in the box at the top left and press Enter to name it, for example D for annual demand. Type a cell address such as B10 and Enter to jump to it. Names are not case sensitive.

3

Your policy, in pictures

Each picture unlocks as you finish its steps

Demand during lead time and the service level

Stock over time: order quantity, reorder point, safety stock

Total cost curve, from your data table

4

Test two service levels

Task: change the service level in B8, then log the result

Set B8 to one service level, for example 90%, and press Log. Then set it to another, for example 99%, and log again. Compare what the extra service costs in safety stock.

5

Your policy sheet result